A New Edition of Tesla vs. Edison—Alternating Current vs. Direct Current
The first battle was lost in 1896. Now, DC technology is becoming increasingly prevalent. The home and household appliances will be the last stronghold of 230 V AC technology.
From 1882 to 1896, the great rivalry was between Nikola Tesla and Thomas Edison: AC (alternating current) versus DC (direct current). The rivalry came to an end with the transmission of electricity from a hydroelectric power plant at Niagara Falls to the city of Buffalo, 42 km away: alternating current prevailed.
Why should we care about this today? A glance at the electricity bill reveals quite substantial grid fees. Grid fees are the “shipping costs” for electricity. Okay, we live in wealthy industrialized nations; we can afford it. Really?
What individual citizens see as a grid fee on their electricity bill is just the tip of the iceberg. In Germany, it amounts to 33 billion euros per year, and in Austria, 3 billion euros per year. Everything we consume also includes the grid fees that producers, transporters, and retailers are required to pay.
There’s been talk of wind energy from the North Sea. But what does building transmission lines from the North Sea to Bavaria mean for grid fees? Grid fees have more than doubled since 2015; a 7% annual increase is well above the general inflation rate.
Grid fees account for a significant portion of the price of electricity. The price of electricity determines the pace of the phase-out of oil in the transportation sector. While purchasing decisions for passenger cars are often influenced by tradition, freight companies are penny-pinchers who calculate the exact costs per metric ton and kilometer of freight. A 5-cent-per-kWh increase in grid fees can be the deciding factor between a diesel truck and an electric truck in this context.
|
The Comeback of Direct Current
|
The first step was a 20 MW, 100 kV DC transmission line built in 1954 from Stockholm to the island of Gotland, 98 km away. Today, China has DC transmission lines with voltages of up to 1.1 million volts and a transmission capacity of 12 GW. When it comes to high power and long distances, DC is now the clear leader.
|
From Photovoltaics to the Power Grid
|
What stands between the photovoltaic system and the power grid? The inverter. It converts the direct current from the photovoltaic system into alternating current. Since 2000, the design of these devices has undergone a fundamental shift from large, heavy transformers to small, high-frequency transformers.
How so? It says “high frequency,” but don’t we only have 50 or 60 hertz? Because this high-frequency transformer constantly changes the output voltage—exactly as often as necessary—so that this nice sine wave appears at the output 50 or 60 times per second.
Without this technological change, global demand for copper would be 2 million metric tons higher per year, and the price of copper would be 20 to 50 percent higher.
|
Grid Connection for Energy-Efficient Communities
|
Conventional: Each individual house has a 20-kW inverter. The 400-V AC power is then fed to a medium-voltage transformer. More cost-effective: An 800- or 1,000-V DC network within the community. The power is fed into the grid via a DC-to-medium-voltage system.
In 2024, my search for this at the Intersolar trade show was in vain, but now things are moving in that direction. One of the main reasons for this is the new 800 V DC architecture used in large data centers. One motivation for the 800 V DC architecture in data centers is the long lead times for transformers.
Not only is it more cost-effective, but it also offers a significant gain in efficiency. A conventional transformer has constant losses. Modern versions have losses of only 0.1%—but for a typical 400 kVA transformer serving 100 residential connections, that still amounts to 3,500 kWh per year. You simply can’t turn it off. A solid-state transformer, on the other hand, can be turned off.
If a 1 MW photovoltaic system is connected to a 1 MVA transformer and generates 100 kWh on a cloudy December day, 24 kWh alone are lost due to transformer losses. But that is just one of several sources of loss.
The long lead times for medium-voltage transformers are already affecting global demand for photovoltaics. Existing photovoltaic factories could already supply 1,200 GWp per year.
There are three approaches to resolving this bottleneck:
- For every MWp of photovoltaic capacity, 3 MWh of battery storage, but only 0.3 MW of grid connection
- Solid-State Transformers
- Energy-optimized communities where housing and power generation are combined. Just one transformer, instead of one at the open-field facility and one in the community.
The first major application for solid-state transformers is in data centers with an 800 V DC power supply. The next will be large photovoltaic systems.
Switching to solid-state transformers could save one million metric tons of copper per year. This is a technological advancement that allows us to achieve much more with a limited amount of raw materials.
In the GEMINI next-generation home, a 230 V AC inverter with a 4 kW capacity is provided for the internal grid. Why is this the case when there is already a 20 kW inverter for feeding power into the grid? Because of the high baseline demand. A 120-watt baseline demand is no problem when 20 kW is being exported to the grid. However, if the house currently requires only 60 watts AC, then a 120-watt baseline demand represents an unacceptable waste. The large inverter for feeding power into the grid will therefore only be turned on for about 2,000 hours a year.
For small consumers in home electrical systems, 230 V AC technology remains the standard. A hair dryer or vacuum cleaner makes no sense with either 48 V DC or 1,000 V DC. So, quite simply, stick with what has been proven over more than a century.
Direct power supply via a battery makes sense only for stationary high-volume consumers. For example, a heat pump.
Maybe we'll do it to set a world record for the most energy-efficient hot water production and get it listed in the Guinness Book of World Records.
|
Who are we? Our shareholders
|
Who are we? Our shareholders. I ask all existing shareholders—and, hopefully, many new ones soon—to submit contributions like this.
So far, only 2% of our shareholders have become shareholders themselves by referring new shareholders. That number should increase significantly in the future. The offer is 10% of the purchased shares for a direct referral and 5% for an assist. I understand the term “assist” in the same way as in soccer: whoever passes the ball to the goal scorer has made an assist. |